universal containers wants to report on the volume of products installed within a
specific timeframe.
Which solution should the consultant utilize to meet the requirement?
A. A work order related list on asset
B. A custom installation date field on products consumed
C. Field history tracking on asset
D. The standard installation date field on asset
B. A custom installation date field on products consumed
Explanation:
Products consumed are records that track the products used during a service
appointment[32]. A custom installation date field on products consumed would allow
reporting on the volume of products installed within a specific timeframe by filtering on the
installation date field values[33]. A work order related list on asset would show the work
orders associated with an asset, but not the products installed. Field history tracking on
asset would track field changes on an asset, but not the products installed. The standard
installation date field on asset would show when an asset was installed, but not the
products installed.